{"id":257,"date":"2015-06-22T16:03:16","date_gmt":"2015-06-22T16:03:20","guid":{"rendered":"\/?page_id=257"},"modified":"2023-04-06T08:15:16","modified_gmt":"2023-04-06T06:15:16","slug":"geschichte","status":"publish","type":"page","link":"https:\/\/www.aerosol-service.com\/en\/company\/history\/","title":{"rendered":"History"},"content":{"rendered":"<p><\/p>\n<p><strong>1953<\/strong><\/p>\n<p style=\"padding-left: 40px;\">ASM Aerosol-Service AG is founded in Riehen. It is the first Swiss company to produce aerosols as a contract manufacturer<\/p>\n<p><strong>1964<\/strong><\/p>\n<p style=\"padding-left: 40px;\">Start of production at the M\u00f6hlin site<\/p>\n<p><strong>1966<\/strong><\/p>\n<ul>\n<li>Construction of the first filling line for pharmaceutical products<\/li>\n<li>The manufacturing license to produce medicinal products is issued to ASM for the first time<\/li>\n<\/ul>\n<p><strong>1975<\/strong><\/p>\n<p style=\"text-align: left; padding-left: 40px;\">Swissmedic grants manufacturing authorization for medicinal products for the first time<\/p>\n<p><strong>1980<\/strong><\/p>\n<p style=\"padding-left: 40px;\">After a period of continuous expansion, the relocation from Riehen to M\u00f6hlin is completed<\/p>\n<p><strong>1982<\/strong><\/p>\n<p style=\"padding-left: 40px;\">ASM develops and patents the Bag-on-Valve system (BOV)<\/p>\n<p><strong>1991<\/strong><\/p>\n<p style=\"padding-left: 40px;\">A new high-bay warehouse for 4,200 pallets is put into operation<\/p>\n<p><strong>1995<\/strong><\/p>\n<ul>\n<li>After a management buyout, ASM is privately owned<\/li>\n<li>In the same year ASM is ISO 9001 certified<\/li>\n<\/ul>\n<p><strong>2001<\/strong><\/p>\n<p style=\"padding-left: 40px;\">Construction of a pharmaceutical filling area GMP and ISO 9001 compliant (cleanroom class D)<\/p>\n<p><strong>2003<\/strong><\/p>\n<p style=\"padding-left: 40px;\">ASM is GMP certified by Swissmedic<\/p>\n<p><strong>2005<\/strong><\/p>\n<p style=\"padding-left: 40px;\">A new pharmaceutical mixing area GMP and ISO 13485 compliant is put into operation (cleanroom class D)<\/p>\n<p><strong>2008<\/strong><\/p>\n<ul>\n<li>Construction of a unique multipurpose filling line (aerosol\/liquid) to produce pharmaceutical and cosmetic products under GMP and cleanroom conditions (cleanroom class C)<\/li>\n<li>ASM is ISO 13485 certified<\/li>\n<\/ul>\n<p><strong>2009<\/strong><\/p>\n<p style=\"padding-left: 40px;\">Construction of a temperature-controlled warehouse for raw materials and finished products<\/p>\n<p><strong>2012<\/strong><\/p>\n<ul>\n<li>ASM is ISO 22716 certified<\/li>\n<li>Successful audit for Gulf Cooperation Council (GCC)<\/li>\n<\/ul>\n<p><strong>2013<\/strong><\/p>\n<p style=\"padding-left: 40px;\">Successful audit of the Turkish authorities Ministry of Health Turkey (MoH TR)<\/p>\n<p><strong>2014<\/strong><\/p>\n<ul>\n<li>A new highly flexible packaging line according to pharmaceutical standards is put into operation<\/li>\n<li>Start with the construction of a high-bay warehouse with 3,200 storage locations according to pharmaceutical standard (explosion protection EXII and temperature controlled)<\/li>\n<li>Participation in the energy saving program: ASM commits to reduce the legally defined energy and CO2 emissions until 2024<\/li>\n<\/ul>\n<p><strong>2015<\/strong><\/p>\n<ul>\n<li>An additional packaging line incl. serialization is put into operation<\/li>\n<li>Successfully audited by FDA registration FEI-No. 3005439256<\/li>\n<li>Finalization of the new pharmaceutical high-bay warehouse (3,200 pallet spaces)<\/li>\n<li>Roof refurbishment of the existing chemical and finished product warehouses with the aim of further increasing energy efficiency<\/li>\n<\/ul>\n<p><strong>2016<\/strong><\/p>\n<ul>\n<li>Successful Pre-approval inspection by the Korean Ministry of Food and Drug Safety (MFDS)<\/li>\n<li>Expansion of the pharmaceutical filling line with a leak detector P4<\/li>\n<li>Implementation of a cold chain for raw materials and finished goods in the range of 2-8\u00b0<\/li>\n<\/ul>\n<p><strong>2017<\/strong><\/p>\n<ul>\n<li>Successful registration at the Japanese Authorities (PMDA)<\/li>\n<li>Successfully audited by the FDA for the second time<\/li>\n<li>Expansion of blending capacities with a development vessel 3 \u2013 12 L, a 200 L pilot plant and a new 1800L plant, all from the same manufacturer<\/li>\n<li>Acquisition and qualification of an additional serialization line<\/li>\n<li>Installation of an additional Leak Detector in P3<\/li>\n<\/ul>\n<p><strong>2018<\/strong><\/p>\n<ul>\n<li>Decision of the Board of Directors for the long-term expansion of the site in the pharmaceutical -filling, packaging and laboratories<\/li>\n<li>Expansion of the organization through an additional management level<\/li>\n<li>Additional investments in new energy efficiency measures to further reduce CO2 emissions<\/li>\n<li>Mid-year start with the introduction of a new ERP system<\/li>\n<\/ul>\n<p><strong>2019<\/strong><\/p>\n<ul>\n<li>Equipping all pharmaceutical packaging lines with serialization systems<\/li>\n<li>Successful implementation of a validated ERP system<\/li>\n<li>The 1800L mixing plant is put into operation<\/li>\n<li>Construction of a new pharmaceutical cold store (2-8\u00b0) for approx. 100 pallets<\/li>\n<li>Introduction of scanner systems in the warehouse<\/li>\n<li>Successful auditing by the Ministry of Industry and Trade of Russian Federation (MITRF)<\/li>\n<\/ul>\n<p><strong>2020<\/strong><\/p>\n<ul>\n<li>Start of the expansion of the site by a new floor with approx. 1400 sqm of laboratory and office space<\/li>\n<li>Another multi-purpose filling line and an additional packaging line to produce pharmaceutical and cosmetic products under GMP and clean room conditions is ordered<\/li>\n<li>The new ex-pharmaceutical cold storage facility is put into operation<\/li>\n<li>Introduction of a new LIMS system in the QC department<\/li>\n<li>Russian authorities successful audit for the manufacture of additional products at ASM<\/li>\n<li>Start the refurbishment of existing premises in P2<\/li>\n<li>Construction of new P5 packaging and filling rooms according to pharmaceutical standards in cleanroom class C\/D\/E and F<\/li>\n<\/ul>\n<p><strong>2021<\/strong><\/p>\n<ul>\n<li>The new pharmaceutical room and the new pharmaceutical packaging plant is put into operation<\/li>\n<li>Start of construction work for the new pharmaceutical multi-purpose filling plant (aerosol\/liquid)<\/li>\n<li>Start of construction of new ventilation and laboratory facilities<\/li>\n<li>Modernization of the IT networks to the latest state of the art<\/li>\n<\/ul>\n<p><strong>2022<\/strong><\/p>\n<ul>\n<li>Finalization of the new, state-of-the-art QC and R&amp;D laboratories, including a dedicated HIPO laboratory with separate personnel and material locks class H14<\/li>\n<li>Move into the new office premises<\/li>\n<li>Expansion of the parking lots and the surrounding area<\/li>\n<li>Commissioning of an additional transformer station<\/li>\n<li>The new pharmaceutical multi-purpose filling line P5 is put into operation<\/li>\n<li>Implementation of the first PV systems to generate electricity for own use<\/li>\n<li>Various digitalization projects launched and implemented (HR, QA, QC)<\/li>\n<li>Defined reduction of energy and CO2 emissions target already achieved or exceeded<\/li>\n<\/ul>\n<p><strong>2023<\/strong><\/p>\n<ul>\n<li>Installation of another PV system<\/li>\n<li>Start renovation of the last production premises<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><a href=\"\/wp-content\/uploads\/2015\/06\/geschichte1.jpg\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-262\" src=\"\/wp-content\/uploads\/2015\/06\/geschichte1.jpg\" alt=\"geschichte1\" width=\"120\" height=\"142\" srcset=\"https:\/\/www.aerosol-service.com\/wp-content\/uploads\/2015\/06\/geschichte1.jpg 425w, https:\/\/www.aerosol-service.com\/wp-content\/uploads\/2015\/06\/geschichte1-253x300.jpg 253w\" sizes=\"auto, (max-width: 120px) 100vw, 120px\" \/><\/a> <a href=\"\/wp-content\/uploads\/2015\/06\/geschichte2.jpg\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-268\" src=\"\/wp-content\/uploads\/2015\/06\/geschichte2.jpg\" alt=\"geschichte2\" width=\"120\" height=\"142\" srcset=\"https:\/\/www.aerosol-service.com\/wp-content\/uploads\/2015\/06\/geschichte2.jpg 425w, https:\/\/www.aerosol-service.com\/wp-content\/uploads\/2015\/06\/geschichte2-253x300.jpg 253w\" sizes=\"auto, (max-width: 120px) 100vw, 120px\" \/><\/a> <a href=\"\/wp-content\/uploads\/2015\/06\/geschichte3.jpg\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-269\" src=\"\/wp-content\/uploads\/2015\/06\/geschichte3.jpg\" alt=\"geschichte3\" width=\"120\" height=\"142\" srcset=\"https:\/\/www.aerosol-service.com\/wp-content\/uploads\/2015\/06\/geschichte3.jpg 425w, https:\/\/www.aerosol-service.com\/wp-content\/uploads\/2015\/06\/geschichte3-253x300.jpg 253w\" sizes=\"auto, (max-width: 120px) 100vw, 120px\" \/><\/a> <a href=\"\/wp-content\/uploads\/2015\/06\/geschichte4.jpg\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-270\" src=\"\/wp-content\/uploads\/2015\/06\/geschichte4.jpg\" alt=\"geschichte4\" width=\"120\" height=\"142\" srcset=\"https:\/\/www.aerosol-service.com\/wp-content\/uploads\/2015\/06\/geschichte4.jpg 425w, https:\/\/www.aerosol-service.com\/wp-content\/uploads\/2015\/06\/geschichte4-253x300.jpg 253w\" sizes=\"auto, (max-width: 120px) 100vw, 120px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>1953 ASM Aerosol-Service AG is founded in Riehen. It is the first Swiss company to produce aerosols as a contract manufacturer 1964 Start of production at the M\u00f6hlin site 1966 Construction of the first filling line for pharmaceutical products The manufacturing license to produce medicinal products is issued to ASM for the first time 1975&#8230;<\/p>\n","protected":false},"author":16,"featured_media":0,"parent":5,"menu_order":2,"comment_status":"closed","ping_status":"closed","template":"page_unternehmen.php","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-257","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.aerosol-service.com\/en\/wp-json\/wp\/v2\/pages\/257","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aerosol-service.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.aerosol-service.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.aerosol-service.com\/en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aerosol-service.com\/en\/wp-json\/wp\/v2\/comments?post=257"}],"version-history":[{"count":60,"href":"https:\/\/www.aerosol-service.com\/en\/wp-json\/wp\/v2\/pages\/257\/revisions"}],"predecessor-version":[{"id":4560,"href":"https:\/\/www.aerosol-service.com\/en\/wp-json\/wp\/v2\/pages\/257\/revisions\/4560"}],"up":[{"embeddable":true,"href":"https:\/\/www.aerosol-service.com\/en\/wp-json\/wp\/v2\/pages\/5"}],"wp:attachment":[{"href":"https:\/\/www.aerosol-service.com\/en\/wp-json\/wp\/v2\/media?parent=257"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}